TfL confirmed that there will be traffic “reassignment” onto residential roads. The information is contained within their consultation report: Consultation Report |
What does this mean for your area?
There are a few points to note in considering the information below:
These slides show the “high level” or “strategic” modelling which TfL uses. Crucially, this does not model each road likely to be affected, but just one or two in the area so they can see just a little of the impact.
The slide below shows the morning peak after CS11 is introduced:
There are a few points to note in considering the information below:
- TfL’s data is old, being last obtained in 2012.
- TfL has not modelled to include HS2, the largest building project in the UK for the next 20 years.
- TfL has not modelled for major developments coming online during or shortly after CS11 is implemented.
These slides show the “high level” or “strategic” modelling which TfL uses. Crucially, this does not model each road likely to be affected, but just one or two in the area so they can see just a little of the impact.
The slide below shows the morning peak after CS11 is introduced:
Morning Peak
Likewise the TfL slide showing the evening peak after CS11 is introduced: